Test Operation - Stanley QED 100 Serie Instrucciones De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

19
Threaded Stem
Select the top rod.
Screw the threaded end
of the top rod onto the
Note: the top rod is the
threaded stem of top
rod that does not have
latch. Screw the rod on
a rod connector
completely.
already attached.
21
Top Rod
Rod connector
Set screw
Mounting hole
1
Depress the push bar:
Bolts of top and bottom
latch assemblies should
retract, allowing door to
swing open.
20
Top Rod
With mounting hole
aligned to mount onto
device, insert
connector into the top
rod. Tighten the set
screw to allow
connector to expand
inside the rod creating
a secure fit.
2
Release the push bar:
Bolts of top and bottom latch
assemblies should extend,
allowing bolts to reside within
the top and bottom strikes.
Install Top Rod
Top rod
Cut line
Mark cut line
22

Test Operation

3
Test the exterior trim for
locking and unlocking.
6/20
Edge of
rod connector
Rod
connector
Rod connector
Fasten the rod
connector to exit device
with screw.
4
Repeat test a few time to
ensure smooth operation.
Make adjustment until
operation is correct.
Align the rod
connector into the
position in which it is
to be later installed.
With the rod
connector in aligned
position, mark a cut
line onto the top rod,
to eliminate any
excess area of rod
that extends beyond
the edge of the rod
connector. Cut off
excess portion of rod,
if any.

Publicidad

Tabla de contenido
loading

Tabla de contenido