Layher 1401101 Instrucciones De Montaje Y Uso página 46

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4. Insert diagonal braces
18
braces must be installed in a tower-like (zig-zag) form on both sides.
5. Climb up to the next level and fit additional rear guardrails
second rung above the platform surface.
14
and an access deck 23. The diagonal
Completion of working platform
All tower models
1. To complete the working platform, attach toe boards with claw
and end toe boards 29.
If an intermediate platform is also to be used as a working
platform, attach toe boards here too.
Operating the castors
15
to the
During assembly and while working, keep
the castors locked by pressing down the
brake lever labelled STOP.
When the brake is locked, the lever
labelled STOP is in the down position.
For movement, unlock the castors by
pushing the opposite lever down.
28

Publicidad

Tabla de contenido
loading

Productos relacionados para Layher 1401101

Tabla de contenido