}
15. IDENTIFICATION SIGN
Identiication and Approval
of mobile working platforms (rolling towers) as per DIN EN 1004
Scaffolding erector:
Telephone number:
Place of erection:
Tower No.:
2 (150 kg/m²)
Scaffolding group:
The sum of the live loads of all scaffolding levels positioned one above the other inside one scaffolding bay
must not exceed the above value.
A Stairway
Access type:
Maximum permissible platform height as per instructions for assembly and use.
outside buildings:
inside buildings:
Restrictions on use applying to the user:
Unauthorized changes to the scaffolding are prohibited unless the scaffolding erector
has been consulted beforehand! The castors must be locked during work on the scaf-
folding. The instructions for assembly and use must be carefully complied with!
Inspected and approved
Qualiied person of scaffolding erector:
Date, signature
Wilhelm Layher GmbH & Co. KG
Scaffolding Grandstands Ladders
Ochsenbacher Strasse 56
D-74363 Gueglingen-Eibensbach
Qualiied person during assembly:
Assembly period:
Qualiied person for inspection:
Inspection period:
Client:
Telephone number:
3 (200 kg/m²)
B Step Ladder C Angled Ladder D Vertical Ladder
________________ m
________________ m
Qualiied person of user:
Date, signature
MASTER COPY
The identification sign incl. inspection record can be
downloaded from www.layher.com.
31