Adjusting Roll Groove Depth - EGAmaster 56060 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1. Pipe or tubing longer than the specified maximum lengths listed in Chart above must be supported with
2 pipe stands. The second pipe support should be located 3/4 of pipe length from roll groover.
Failure to use two stands may result in the unit tipping or the pipe falling.
2. Raise upper groove roll housing by placing pump release lever in RETURN position.
3. Square pipe and pipe support to roll groover making sure pipe is flush against drive roll flange (figure 2)
4. Level pipe by adjusting pipe stand.
NOTE! If running machine in forward, offset pipe 1/2° away from operator (figure 3)
NOTE! If running machine in reverse, offset pipe 1/2° toward operator (figure 4)
NOTE! Due to differing pipe characteristics, a test groove should always be performed when
setting up or changing pipe sizes. The index depth adjustment knob must be reset for each diameter
of pipe/tube.
1. Advance the upper groove roll by pumping the handle until the upper roll contacts the pipe to be
grooved.
NOTE! Upper roll should only touch the pipe surface. Care must be taken not to penetrate pipe
surface with upper roll by applying excessive pressure.
2. Turn down the indexed depth adjustment knob (clockwise) until it stops against the top of the machine.
3. Back the depth adjustment knob off to leave proper distance for groove depth (figure 5).
14
PIPE SET-UP
Figure 3

ADJUSTING ROLL GROOVE DEPTH

Figure 2
Figure 4

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

5606156032

Tabla de contenido