Mechanical Release; Initial Testing - Roger CTRL Instrucciones Y Advertencias Para El Instalador

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 168
18

Mechanical release

In the event of a fault or mains power loss, the barrier may be released and opened manually.
For further information, refer to the locking/release operation in the manual of the
BIONIK4, BIONIK4HP, BIONIK6, BIONIK8 automation system.
If the barrier is unlocked while the controller is powered, the message
locked again.
If a "ventouse" electric lock is installed, unlocking the barrier cuts off the power supply, making it possible to move the
boom manually.
The barrier resumes normal operation once the release system is locked again.
19

Initial testing

The installer is required to measure impact forces and select on the control unit the appropriate
speed and torque values to ensure that the motorised door or gate remains within the limits
Make sure that the provisions in Chapter 1 "GENERIC WARNINGS are observed.
• Turn on the power supply.
• Perform travel acquisition.
• Set acceleration, speed and deceleration values. Check that the values are correct for the
installation type. The boom must approach the mechanical stop at low speed, and then
press gently against the stop to hold the boom in the closed position. Setting a value between
and
for parameter
stops slowly without vibration. For booms up to 4 m in length, values between
recommended for parameters
NOTE
• Check that all connected controls are working correctly.
• Check that the release device functions correctly. The message
display.
• Check if the impact forces are compliant with the EN 12453 and EN 12445 standards.
• Check that the safety devices are activated correctly.
• If installed, check the correct operation of the BreakAway ACS/BA/60 detachable boom
coupling system.
• If the battery kit is installed, disconnect from mains and check that the batteries are working.
• Disconnect from mains power and disconnect the batteries (if used), then reconnect. With the
barrier stopped in an intermediate position, check that the manoeuvre is performed correctly.
• Check that the mechanical stops are set correctly. Repeat the travel acquisition procedure
after each adjustment.
• In the case of installations with two opposed barriers, request a manoeuvre and check that
both barriers function correctly.
• If a "ventouse" electric lock is used, check that when the boom is completely closed the lock
96
ensures that the boom approaches and arrests against the
and
. For longer booms, set a higher value.
and
are
. Avoid excessive

Publicidad

Tabla de contenido
loading

Tabla de contenido