Exhaust System Requirements - Haier RDE350AW Manual Para El Usuario

Secadoras de ropa a gas y eléctricas
Ocultar thumbs Ver también para RDE350AW:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Gas Supply Line
The gas supply line should be ½" (1.3 cm) pipe and must have an individual
manual shut-o valve installed within 6 ft. (183 cm) of the dryer in accordance
with the National Fuel Gas Code, ANSI Z223.1/NFPA 54, or in Canada with the
Natural Gas and Propane Installation Code, B149.1.
The shut-o valve should be easy to reach for opening and closing.
A
" NPT minimum plugged tapping must be installed immediately upstream of
the shut-o valve. This tting is used to check the gas pressure.
The supply line should terminate with a
¹⁄₂" NPT Gas Supply Line
Gas Shut-O Valve
¹⁄₈" NPT Minimum Plugged Tapping
" NPT Flare Adapter Fitting

EXHAUST SYSTEM REQUIREMENTS

This section describes the requirements for a safe and efficient exhaust
system. Failure to follow these instructions can result in poor dryer
performance, damage to the dryer, and a re hazard.
DUCTING
If your current exhaust system is constructed of plastic or metal foil exible
ducting, replace it with rigid metal ducting.
Use only 4" (10.2 cm) diameter rigid metal ducting.
When making turns in the ductwork, use 45° elbows rather than 90° elbows. This
provides better air ow and can reduce the accumulation of lint in the exhaust
system.
WARNING
90° - Good
" NPT are adapter tting.
B
A
45° - Better
C
D
11

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Rdg350awCrde350aw

Tabla de contenido