PEERLESS mount Instalación Y Montaje página 11

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Cable Management
NOTE: Make sure cables have enough slack to allow full movement of the arm.
6
Run power cable through top or bottom of arm (A) and signal cable(s) through other side of arm in order to avoid
interference with the signal. Lock cables into place by snapping cable covers (J & K) onto mount. Screen may have
to be moved for easy access.
Optional: If additional cable management is required route cable ties (G) through slots of arm (A) as shown in
detail 3.
• Do not remove screw or loosen screw until it is no longer engaged with the mount. Doing so may cause the screen
to fall.
• If screws become loose over time, tighten screws as necessary. Tighten screws to 50 in • lbs (5.6 N.m.) maximum
torque.
If more or less tension is desired in the arm pivot points, do the following:
7
• To increase tension, turn socket screw clockwise with 5 mm allen wrench (I). NOTE: Tighten screws to
50 in • lbs (5.6 N.m.) maximum torque.
• To reduce tension, turn socket screw counter-clockwise with 5 mm allen wrench (I). NOTE: Do not turn more
than half a turn.
J
K
A
G
SLOT
CABLE
DETAIL 3
WARNING
TENSIONS SCREW
TENSIONS SCREWS
11 of 46
All other brand and product names are trademarks or registered trademarks of their respective owners.
ISSUED: 10-30-09 SHEET #: 095-9297-2 12-04-09
© 2009, Peerless Industries, Inc. All rights reserved.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Sa752pu-s

Tabla de contenido