Ecoflam BLU 700.1 LN PAB TC Manual De Uso página 10

Ocultar thumbs Ver también para BLU 700.1 LN PAB TC:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 36
EN
Installation
A
A1
Gas lines
When installing the gas lines and gas train,
the general EN676 directives and
guidelines must be observed.
Additional accessories and kits shall be
installed by the installer in accordance to
the local safety regulations and codes of
practise.
General regulations applying to the
gas connection
• The gas train must only be connected
to the gas mains by a recognised
specialist.
• The cross-section of the gas line should
be of a size designed to guarantee that the
gas flow pressure does not drop below the
specified level.
• A manual shut-off valve (not supplied)
must be fi tted upstream of the gas train.
LEGENDA
Pf: Back pressure of furnace
Pb: Pressure of burner (combustion head
+ complete gas train)
Pin: Minimum inlet pressure
10
www.ecoflam-burners.com
- Burner assembly
A
KITLPG-BLU700.1
KITLPG-BLU1000.1-1500.1
In order to change the burner operation
from natural gas to LPG you have to fol-
low these instructions :
- Remove the blast tube.
- Replace 4 Diffusers with LPG version,
remove A screws.
- Remove the disc.
- Replace Tooth with LPG version.
- Install the disc correctly.
- Replace the blast tube with LPG version
(not for LN version).
LPG TRANSFORMATION
KITLPG
3124488
3124489
420010605300

Publicidad

Tabla de contenido
loading

Tabla de contenido