AGA marvel ML15BCG2Serie Instrucciones De Instalación, Operación Y Mantenimiento página 13

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Step 2: Remove the door gasket
With the door laying on a flat surface and starting at a
corner of the door remove the magnetic door gasket from
the interior side of the door, see Figure 13. Set the gasket
aside on a flat surface.
There are 10 holes in the gasket retainer extrusions, (3 on
each side and 2 at the top and bottom which are used to
fasten the panel to the front of the door. The screws are
provided in the literature pack along with the door lock,
which is provided on certain models.
Press and hold down this
tab on the wire connec-
tor and pull the connector
apart.
Figure 12
OVERLAY DOOR PANEL INSTALLATION
Holes in
gasket
retainer.
Figure 13a
Figure 13
Step 3: Cut and drill the overlay panel
Depending on your model cut the overlay door panel to the
dimensions shown in Figure 14 to Figure 17. The window
cut out is for glass door models only.
CAUTION
!
Weight of overlay door panel must not exceed 15
pounds (6.8 kg) for a solid door model or 10 pounds
(4.5 kg) for a glass door model.
13
Overlay panel
flush with top
of door.
Overlay panel to
be centered on
width of door.
Magnetic Gasket
remove starting at
a corner, grasp and
pull away from the
door.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ml15bcf3 serieMl15bcp3 serieMl15bcg2ls

Tabla de contenido