Descargar Imprimir esta página

Victron energy BlueSolar MPPT 75/50 Manual Del Usario página 10

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

3.6 Battery charging information
The charge controller starts a new charge cycle every moring,
when the sun starts shining.
The maximum duration of the absorption period is determined by
the battery voltage measured just before the solar charger starts
up in the morning:
Battery voltage Vb (@start-up)
Vb < 23,8V
23,8V < Vb < 24,4V
24,4V < Vb < 25,2V
Vb > 25,2V
(divide voltages by 2 for a 12 V system)
If the absorption period is interrupted due to a cloud or due to a
power hungry load, the absorption process will resume when
absorption voltage is reached again later on the day, until the
absorption period has been completed.
The absorption period also ends when the output current of the
solar charger drops to less than 2 Amps, not because of low solar
array output but because the battery is fully charged (tail current
cut off).
This algorithm prevents over charge of the battery due to daily
absorption charging when the system operates without load or
with a small load.
3.7 Connectivity
Several parameters can be customized (VE.Direct to USB cable,
ASS030530000, and a computer needed). See the data
communication white paper on our website.
The required software can be downloaded from
http://www.victronenergy.nl/support-and-downloads/software/
The charge controller can be connected the to a Color Control
panel, BPP000300100R, with a VE.Direct to VE.Direct cable.
8
Maximum absorption time
4 h
2 h
1 h
0 h

Publicidad

loading