Chapin 81008A Manual De Uso Y Cuidado página 3

Ocultar thumbs Ver también para 81008A:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

• Assemble linkage to bail assembly (Fig. A).
• Assemble linkage to rotate link (Fig. B).
• Rotate the turnbuckle to adjust the gate (Fig. C).
Bail Position for adjusting Gate:
1) Bail must be in rest position for Gate Closed.
2) Bail must be depressed for Gate Open.
AUGER ASSEMBLY
SPIKED AUGER ASSEMBLY
Thread auger clockwise onto impeller shaft. Insert auger nut.
Tighten with 10 mm wrench. Do not over tighten.
Choose spiked auger for use with dense materials that have a
tendency to clump or have a higher moisture content.
• Ice Melt- Calcium Chloride
• Lawn Mineral Supplement
CAUTION: This spreader is NOT recommended for use with rock salt.
Figure A
Chapin Spreader Operator's Manual - English
Fully Assembled
2E
To Close Gate
(Increase Length)
To Open Gate
(Decrease Length)
Figure C
Figure B
IMPELLER
SHAFT
AUGER
NUT
AUGER

Publicidad

Tabla de contenido
loading

Tabla de contenido