Franke AT3O0044 Instrucciones De Montaje Y Uso página 7

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Important!
Prior to the assembly process, flush the pipework in accordance with DIN 1988.
To protect the tiles, use masking tape when marking and drilling. Drill at low speed.
Depending on the composition of the wall, special wall plugs may have to be used
(to be provided by the customer).
Lay the system line (not included in delivery) in the empty pipe (to be provided by the
customer) from the power supply to the fittings and loop through.
Fig. A: Water connection from above
Fig. B: Water connection from the rear
12.1 Only for water connection from the rear: Install the connection brackets (a) leak-tight.
12.2 Screw in the water volume regulators (b) leak-tight.
12.3 Align the water volume regulators so that the locking screw and operating element
are freely accessible.
12.4 For a shower head height of 2.10 m to 2.30 m, mark drill holes for installation at a
height (c) of 2.12 m to 2.32 m from the top of the finished floor.
12.5 Drill holes in accordance with these markings.
12.6 Insert the wall plugs.
12.7 Screw on the suspension rail.
12.8 Suspend the shower panel.
12.9 Mark the remaining drill hole.
12.10 Remove the shower panel.
12.11 Drill hole in accordance with the marking.
12.12 Insert the wall plug
Install the electrical T-distributor
Important!
The components of the electrical T-distributor may only be installed after the power
has been switched off.
Recommended system cable see
When using cables other than the system cable, pay attention to the different colour
code. The outer diameter must not exceed 7.5 mm.
12.13 Remove the sheathing (a) of the system cable (approx. 40 mm).
12.14 Push the cap nut (c) onto the system cable (b) up to the limit stop.
Chapter
28., accessories.
7

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

At3o00467612982218002761298221824820300197352030019830

Tabla de contenido