☞
The various wire guides are marked with numbers 1 to 4.
A: Union nut
B: FAR-Best.-Nr. 2000104272
FAR-Best.-Nr. 2000104274
FAR-Best.-Nr. 2000100801
FAR-Best.-Nr. 2000100852
12.15 Engage the wires (d) on the wire guides (e) according to their colours.
12.16 Cut off the projecting wire ends flush, i.e. without protrusions.
12.17 Push the union nut (c) onto the electrical T-distributor (f) and tighten it to the required
torque (1.2 Nm).
Caution!
Note the polarity.
The same wire colour must be in the same wire guide for both union nuts.
☞
When tightening the union nut, the electrical contact and tension relief are created
automatically.
Special seals act as protection from dust and water.
12.18 Connect the wires between the electronic module, the solenoid valve cartridge and
the piezo button.
A: Solenoid valve cartridge for mixed water
B: Solenoid valve cartridge for thermal disinfection bypass (optional)
C:0-10 V analogue output
D:Cold water temperature sensor (optional)
E: Hot-water temperature sensor (optional)
F: Sensor connection 2/3
G:Piezo button
H:Electrical T-distributor system cable (power)
K: Electronic module
12.19 Only for water connection from the rear: Prioritise work steps 12.21 to 12.23.
12.20 Mount the shower panel on the suspension rail and screw tight.
12.21 Establish the water connections.
12.22 Open the water volume
d: closed
e: open
12.23 Check the water connections for leaks.
8
regulators
using an Allen key.
A
1
brown
2
white
3
blue
4
black
B
red
white
blue
black