Install the Bidet (cont.)
Complete the Installation
Connect the water supplies and drain.
Turn on the hot and cold shut-off valves. Check the entire
installation for leaks. Repair as required.
Check all connections for leaks for several days.
1020412-2-B
4
Kohler Co.