General Information; Operating Cycle - Pentair PRO-SOURCE PS6-S02 Manual Del Propietário

Tanques de presión de acero
Ocultar thumbs Ver también para PRO-SOURCE PS6-S02:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

General Information

GENERAL INFORmATION
All tanks are factory pre-charged with air. When
installing tank, adjust pre-charge to 2 PSI below
pump cut-in pressure setting. To do this, bleed or
add air through valve on top of tank.
NOTICE: Transport and install tank in vertical
position ONLY!
NOTICE: Always set pre-charge with NO WATER
in tank.
Check pressure frequently with an accurate tire
pressure gauge until correct pressure has been
reached. For correct pre-charge pressure settings,
see Chart 1, below.
CHART 1
Pressure Switch Setting
Tanks
20-40 PSI
30-50 PSI
40-60 PSI
Tank Pre-charge Settings for use with PENTEK
INTELLIDRIVE Variable Frequency Drives
Set the pressure tank's pre-charge to 70% of the
system operating pressure. When using an external
set point as well as an internal set point, pre-
charge the tank to 70% of the lower set point of
the two. Some applications may require a different
percentage when figuring the set point. Refer to
your PENTEK INTELLIDRIVE operator's manual for
Pressure Switch
additional information.
From
Well
Pressure Switch
Figure 1A
Tanks
From
Well
Pressure Switch
Figure 1B
Tank Precharge (PSI)
18
28
38
A
Tanks
To
Service
Tanks
NOTICE: Replace and tighten air valve cap if it is
removed for any reason. Failure to replace air cap
may allow loss of air pressure and eventually lead
to tank waterlogging and water cell failure.
Pre-charged storage tanks can be connected
together to increase the supply of usable water
(drawdown). Two tanks of the same size will
double the supply and three tanks will triple the
supply. See Figures No. 1A and 1B for typical
installations of this kind.

OPERATING CYCLE

1.
Tank nearly empty – air expands filling area
above vinyl water cell (Fig. 2A).
2.
Water begins to enter tank – air is compressed
above water cell as it fills with water (Fig. 2B).
3.
Pump-up cycle completed – air now
compressed to cut off setting of pressure
switch (Fig. 2C).
To
B
Service
WATER
WATER
Figure 2
CHART II – Water Yield Per Pump Cycle
(drawdown) in Gallons
Pro Source (Plus)
model
PS6-S02
PS6H-S05
191 0893
PS(P)19S-T02
PS(P)19T-T02
PS19H-S00
PS(P)32-T03
PS(P)35-T05
PS(P)50-T50
PS(P)62-T51
To
PS(P)85-T52
Service
PS(P)119-TR50
A
WATER
C
WATER
Pressure Switch Setting (PSI)
20-40
2.2
2.2
6.9
6.9
6.9
11.6
12.7
18.3
21.4
30.0
41.3
3
B
C
WATER
D
157 1013
30-50
40-60
1.8
1.6
1.8
1.6
5.8
5.0
5.8
5.0
5.8
5.0
9.8
8.5
10.7
9.3
15.5
13.4
18.3
16.0
26.0
22.0
35.4
31.0

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido