Pentair PRO-SOURCE PS6-S02 Manual Del Propietário página 6

Tanques de presión de acero
Ocultar thumbs Ver también para PRO-SOURCE PS6-S02:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
NOTICE: Be sure discharge port lines up with hole
in base.
NOTICE: Tighten nuts as follows:
Hand tighten all nuts.
Tighten one nut snug.
Tighten opposite nut snug.
Proceed, tightening opposite pairs of nuts
to a snug fit.
Recheck all nuts, using same pattern. Be
sure all nuts are tight and that you have a
good seal.
NOTICE: Do not overtighten; you may twist
studs off of tank. If you have a torque wrench,
tighten to 85 inch-pounds torque.
12. Stand tank on base and reconnect piping.
13. Recharge tank to proper air pressure (see
Page 4).
14. Prime pump (see pump owner's manual).
AIR VALVE REPLACEmENT
(PS models)
Hazardous Pressure. To be sure air
valve and core cannot blow out of tank, release all
air pressure from tank before removing valve core
or valve.
1.
Disconnect power to pump.
2.
Drain ALL water in system by opening faucet
closest to tank.
3.
Depress valve core to release ALL air pressure
in tank. When air stops coming out of valve,
remove core from inside of valve to release
remaining pressure.
4.
Push air valve back into tank. Be sure to
remove it before reassembling tank.
5.
Disconnect piping from tank and turn it on
its side.
6.
Remove flange from tank.
7.
Push water cell into tank far enough so that
you can get into tank with a dowel rod.
8.
Soap the outside of the new valve and mount
it on the end of a piece of 1/4" or 5/16" dowel
rod. Push the valve up past the water cell into
its mounting hole in the top of the tank. Push
it through as far as it will conveniently go;
leave the valve cap on to protect the threads
on the valve.
9.
Rap the end of the dowel sharply with a
hammer to drive the valve into position. Be
sure the shoulder on the valve seats against
the tank head (the ridge around the valve
body should be all the way through the hole
in the tank head – see Figure 6).
Figure 6 – Tap valve into place
10. Remove the dowel. Make sure the old valve
has been removed from the tank, pull water
cell back over rim of hole in lower tank
head, reinstall flange, stand tank upright and
reconnect piping.
11. Recharge tank (see Page 4), turn on power, fill
system, and tank is ready for service.
AIR VALVE REPLACEmENT
(PSP models)
Hazardous Pressure. To be sure air
valve and core cannot blow out of tank, release all
air pressure from tank before removing valve core
or valve.
1.
Disconnect power to pump.
2.
Drain ALL water in system by opening faucet
closest to tank.
3.
Depress valve core to release ALL air pressure
in tank. When air stops coming out of valve,
remove core from inside of valve to release
remaining pressure.
4.
Unscrew valve from tank and install new
valve. Do not overtighten.
5.
Recharge tank (see Page 4), turn on power, fill
system, and tank is ready for service.
6
2869 0697

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido