2.
Connect neutral wire
C
Connect neutral wire (white or center) (C) of power supply cord
to center terminal block screw (B). Tighten screw.
3.
Connect remaining wires
Connect remaining wires to outer terminal block screws. Tighten
screws. Finally, reinstall terminal block cover. Secure cover with
hold down screw. Now, go to "Venting Requirements."
DIRECT WIRE CONNECTION
B
B
Direct Wire Strain Relief
1.
Attach direct wire strain relief
Unscrew the removable conduit connector (A) and any screws
from a 3/4" (19 mm) UL listed strain relief (UL marking on
strain relief). Put the threaded section of the strain relief (C)
through the hole below the terminal block opening (B). Reaching
inside the terminal block opening, screw the removable conduit
connector (A) onto the strain relief threads.
A
B
C
13