OVE ARUBA Manual Del Usuario página 12

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1. Remove the fixed panel's bottom seal strip (N) and the side panel's bottom seal strip (L) from the base of the fixed
panel (C) and side panel (K).
2. Drill pilot holes for the guide (Q) and the clamp (V) with a ø1/8" (3mm) drill bit.
3-4. Place the support bar's anchor (D) back on it's wall mark, then mark its center on the wall. Drill a hole on the
center marks with a ø5/16" (8mm) drill bit.
5. Insert the wall anchors (DD) using a rubber mallet. Fix the center fitting on the support bar's anchor (D) using the
screws (JJ).
6. Slide again the roller stoppers (E) and the support bar's anchor (D) onto the support bar (F).
Note: Before continuing, place the door panel (J) inside the shower enclosure to facilitate future steps!
1
&
B
B1
3
D
5
D
DD
SUPPORT BAR INSTALLATION
&
C
K
JJ
12
2
ø1/8"
3mm
4
ø5/16"
8mm
7
D
E
F
E

Publicidad

Tabla de contenido
loading

Tabla de contenido