Safety Notes
Gloves should be worn during installation to prevent
crushing and cutting injuries.
The product may only be used for bathing, hygienic
and body cleaning purposes.
The hot and cold supplies must be of equal
pressures.
Installation Instructions
• Prior to installation, inspect the product for transport
damages. After it has been installed, no transport or
surface damage will be honoured.
• The pipes and the fixture must be installed, flushed
and tested as per the applicable standards.
• The plumbing codes applicable in the respective
countries must be observed.
• The drain valve must only be used as intended. It is not
allowed to attach other objects to the drain valve, for
example a semi-pedestal.
• If the instantaneous water heater causes problems or
if you wish to increase the water flow, the EcoSmart
(flow limiter) located behind the aerator can be
removed.
Technical Data
This mixer series-produced with EcoSmart
(flow limiter)
Operating pressure:
Recommended operating pressure:
Test pressure:
(1 MPa = 10 bar = 147 PSI)
Hot water temperature:
Recommended hot water temp.:
Thermal disinfection:
The product is exclusively designed for drinking water!
4
English
®
®
max. 1 MPa
0,1 - 0,5 MPa
1,6 MPa
max. 70°C
65°C
max. 70°C / 4 min
Assembly (see page 32)
Symbol description
Do not use silicone containing acetic acid!
Adjustment (see page 34)
To adjust the hot water limiter. Using a hot
water limiter in combination with a continu-
ous flow water heater is not recommended.
Dimensions (see page 31)
Flow diagram
(see page 31)
with EcoSmart
without EcoSmart
Spare parts (see page 36)
Special accessories
(order as an extra)
special tool #58085000
(see page 32)
Installation putty
(see page 33)
Operation (see page 35)
Hansgrohe recommends not to use as
drinking water the first half liter of water
drawn in the morning or after a prolonged
period of non-use.
After periods of prolonged non-use, but at
least every third day, the fittings must be
opened with the handle in hot and cold
position to prevent stagnation in the
connecting lines. Let the water run until the
water temperature is constant.
Cleaning (see page 38)
Test certificate (see page 40)
®
®