Master Control Box - Bradley Verge LVQD1 Manual De Instalación

Ocultar thumbs Ver también para Verge LVQD1:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation

Master Control Box

Scan to watch maintenance and
troubleshooting videos for the WashBar!
12V 2A
Barrel Plug
Sensor Board 1
Connector
Sensor Board 2
Connector
LED Board
Connector
System Startup
Before providing power to WashBar, make sure the area under the WashBar is clear of any obstructions and
that sensors are clear.
The first time the WashBar is powered up, there is a sequence of LEDs that will light up.
• Within 5-10 seconds of receiving power, the WashBar will cycle it's LED lights RED, GREEN and then BLUE. Once
the LEDs turn blue, the WashBar is in Standby/Idle Mode.
If any of the WashBar LEDs flash RED, check for sensor obstruction. Once obstruction is removed or
cleaned, the WashBar LEDs will return to blue indicating that the WashBar is in Standby/Idle Mode.
• The power LED on the master control box will be GREEN indicating the unit has power.
Bradley • 215-1842 Rev. E; ECO 18-08-023
6V Power LED
Over Current LED
Proximity Cable (USB
1.1 Mini B, Female)
LCD
Status LED
USB Connector
Soap Cable
Water Valve Cable
Dryer Cable
2/4/2019
LVQD1
(Female)
19

Publicidad

Tabla de contenido
loading

Tabla de contenido