Plumbing And Electrical Rough-Ins - Bradley Verge LVQD1 Manual De Instalación

Ocultar thumbs Ver también para Verge LVQD1:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation

Plumbing and Electrical Rough-Ins

Mounting for Standard, ADA and TAS height shown.
33-1/2"
(851)
23-3/4"
CODE
A
H,C
Dedicated 120V ac, 20A GFCI outlet properly grounded and no more than 4 ft. from the installation
E
* If no GFCI outlet is provided, contact a licensed electrician to assure proper electrical connections in accordance with local building codes.
Bradley • 215-1842 Rev. E; ECO 18-08-023
(603)
Tempered
Supply
1-1/2" NPT Drain, Stub-out 2" from wall
1/2" Nominal (5/8" O.D. Comp.) Hot/Cold supplies, Stub-out 2" from wall
(254)
A
H
C
1"
(25)
2-1/4"
(57)
DESCRIPTION
of the dryer assembly*
10"
E
Finished Floor
2/4/2019
LVQD1
(mm)
17-1/2"
(444)
Min.
QTY.
1
1
1
9

Publicidad

Tabla de contenido
loading

Tabla de contenido