Installation
Plumbing and Electrical Rough-Ins
Mounting for Standard, ADA, and TAS height shown.
Typical OmniDeck rough-ins for single WB-TR1 bowl
are shown. Other multiple-bowl rough-ins are similar.
Finished Floor
CODE
A
H, C
Dedicated 120V ac, 20A GFCI outlet properly grounded and no more than 4 ft. from the installation
E
*If no GCFI outlet is provided, contact a licensed electrician to ensure proper electrical connections in accordance
with local building codes.
Bradley • 215-1869 Rev. E: ECO 19-11-006
23-3/4"
(603)
Tempered
Supply
1-1/2" NPT Drain, Stub-out 2" from wall
1/2" Nominal (5/8" O.D. Comp.) Hot/Cold supplies, Stub-out 2" from wall
C L
9"
(229)
1"
(25)
W
C
H
1"
(25)
2-1/4"
(57)
17-1/2"
(444)
DESCRIPTION
of the dryer assembly*
E
Deck Height
23-3/4"
(603)
11/21/2019
LD-5010
(mm)
33-1/2"
(851)
QTY.
1
1
1
13