Project Source 67210-1201 Manual Del Usuario página 5

Ocultar thumbs Ver también para 67210-1201:
Tabla de contenido

Publicidad

ASSEMBLY INSTRUCTIONS
5. Connect a 1/2 in. IPS faucet connector or
coupling nuts (not included) with 3/8 in.
O.D.ball-nose risers (not included) to the
water supplies underneath the sink using
wrenches (not included).
Note: Refer to the local plumbing codes for
permissible types of water supply connectors.
6. Before tightening the faucet connector to the
water supply, apply a second wrench to the
tube from moving or twisting when tightening
the faucet connector. Do not overtighten.
OPERATION INSTRUCTIONS
1. After the installation is complete:
a. Remove the aerator on the faucet (A).
b. Turn on the water supply and allow
both hot and cold water to run for at
least one minute each.
c. While the water is running, check for
leaks.
d. Replace the aerator.
5
6
1
5
A
Lowes.com
®

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

67210-150102701180756562

Tabla de contenido