Operating Instructions; Commissioning - MBM G2SA11 Instrucciones Para El Funcionamiento

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 68

OPeRATIng InSTRUCTIOnS

Commissioning

N.B.! When commissioning the appliance and when starting it after a prolonged stop, it must be
thoroughly cleaned to eliminate all residue of extraneous material (see cleaning instructions).
When cleaning operations have been performed successfully, you may proceed with normal use of the
appliance. See: "Daily activation".
Daily activation
1.
Open the network locks upstream the appliance (gas -
Water - electric, figure 1).
2.
Make sure that the water drain (if present) is not clogged.
3.
Make sure that the cocks (if present) are "Closed".
4.
Make sure that the room exhaust system works properly.
5.
Check the cleanliness and hygiene of the appliance.
When these operations have been done successfully, pro-
ceed with the "Start-up" operations described for each indi-
vidual appliance.
Daily and prolonged deactivation
1.
Close the network locks upstream the appliance (gas -
Water - electric, figure 2).
2.
Make sure that the drain cocks (if present) are "Closed".
3.
Check the cleanliness and hygiene of the appliance. See
"Cleaning instructions".
In the event of prolonged inactivity, protect the parts more
exposed to oxidation as described in the specific chapter
"Cleaning instructions".
THE PRESENT MANUAL IS PROPERT Y OF THE MANUFACTURER. ANY REPRODUCTION, EVEN PARTIAL, IS PROHIBITED.
- 10 -
10
"I"
1
Fig.
"0"
2
Fig.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

G4sa11G2sf11G4sfe11

Tabla de contenido