Operating Instructions; Commissioning; Daily Activation; Daily And Prolonged Deactivation - MBM E2A11 Instrucciones Para El Funcionamiento

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 68

OPERATInG InSTRUCTIOnS

Commissioning

When commissioning the appliance and when starting it after a prolonged stop, it must
be thoroughly cleaned to eliminate all residue of extraneous material (see cleaning
instructions).
When cleaning operations have been performed successfully, you may proceed with normal use of the
appliance. See: "Daily activation".

Daily activation

1.
Open the network locks upstream the appliance (Gas -
Water - Electric, figure 1).
2.
Make sure that the water drain (if present) is not clogged.
3.
Make sure that the cocks (if present) are "Closed".
4.
Make sure that the room exhaust system works properly.
5.
Check the cleanliness and hygiene of the appliance.
When these operations have been done successfully,
proceed with the "Start-up for cooking" operations described
for each individual appliance.

Daily and prolonged deactivation

1.
Close the network locks upstream the appliance (Gas -
Water - Electric, figure 2).
2.
Make sure that the drain cocks (if present) are "Closed".
3.
Check the cleanliness and hygiene of the appliance. See
"Cleaning instructions".
In the event of prolonged inactivity, protect the parts more
exposed to oxidation as described in the specific chapter
"Cleaning instructions".
THE PRESENT MANUAL IS PROPERT Y OF THE MANUFACTURER. ANY REPRODUCTION, EVEN PARTIAL, IS PROHIBITED.
THE PRESENT MANUAL IS PROPERT Y OF THE MANUFACTURER. ANY REPRODUCTION, EVEN PARTIAL, IS PROHIBITED.
- 32 -
- 32 -
32
32
"I"
1
Fig.
"0"
2
Fig.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

E4a11E4f11E2a11qE4a11qE4f11q

Tabla de contenido