Fill the low flow heating circuit using the drainage tap in order to favor
the bleed.
After filling the installation, close the drainage tap.
Refer to the technical and assembly instructions delivered with
the boiler.
This product complies to the requirements to the European Directives
and following standards:
•
73.23EEC Low Voltage Directive
Reference Standard : EN 60.335.1
•
89.336 EEC Electromagnetic Compatibility Directive
Reference Standards : EN 50.081.1, EN 50.082.1, EN 55.014
04/10/06 - 300010513-001-A
Commissionning
Conformity / Marking
EA 113
English
7