Installation Steps; Create Opening; Prepare The System - Waeco CoolAir CA-800-Universal-2 Instrucciones De Instalación

Juego de montaje ca-800 para montaje universal orificio nuevo
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 49
All manuals and user guides at all-guides.com
CoolAir
All connections to the battery of the vehicle should be disconnected before
installing the roof air conditioner.
Non-observance of this regulation can result in danger of electrocution.
After installing the system, the specified parameters of the system soft-
ware must be checked (see chapter "Configuration of system software" on
page 30).
6.2

Installation steps

WAECO International only assumes liability for parts included in the scope
of delivery. The validity of the warranty expires if the device is installed to-
gether with third-party parts.
Check whether the roof of the vehicle is able to support the weight of a
person before climbing onto it. Ask the vehicle manufacturer about the per-
mitted roof loads.

6.2.1 Create opening

➤ Create an opening with the dimensions 488 mm x 436 mm and a cor-
ner radius of R53 (see fig. 2 on page 3, arrow = direction of travel).
Dispose of all waste material separately. Observe the disposal guidelines.

6.2.2 Prepare the system

While preparing the system on the work surface, make sure it does not fall.
Make sure that the surface is even and clean so that the system is not da-
maged.
➤ Lay the roof air conditioner on a work surface with the housing facing
downwards.
➤ Stick the 2 m long insulation tape (25 x 25 mm, see fig. 3 on page 3)
into the existing cavity in the system. Apply a plastic, non-hardening
sealing compound (for example, SikaLastomer-710) to the impact
edge and the top edge of the insulation tape.
Installation
27

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ca-0800-dc

Tabla de contenido