Figure 2
Back
View
Figure 3
Figure 4
8" Deep
10" Deep
12" Deep
PAGE 2 OF 9
ASSEMBLY CONTINUED
ATTACH TOP BAR
1. Place top bar between the two support panels.
2. Align holes on inside of support panels.
Top Bar
3. Insert two short bolts through holes. Thread on M6 flange nuts
4. Repeat steps 2 and 3 on opposite side.
ATTACH PEGBOARD PANELS
1. Place one pegboard panel across the bottom portion of
2. Insert six short bolts through the holes in the pegboard.
3. Repeat steps 1 and 2 for remaining pegboard panel. Install
ATTACH SHELVES
1. Place 12" shelf between the two support panels.
2. Align holes on inside of support panels.
3. Insert two short bolts through holes. Thread on M6 flange nuts
4. Repeat steps 2 and 3 with remaining two shelves.
and secure using 10 mm wrench, but do not tighten.
(See Figure 2)
the two support panels so the second hole from the top and
bottom of the pegboard panel aligns with holes in the support
panels. (See Figure 3)
Thread on M6 flange nuts and secure using 10 mm wrench,
but do not tighten. (See Figure 3)
bottom pegboard panel before installing top pegboard
panel.
and secure using 10 mm wrench, but do not tighten. Repeat
on opposite side. (See Figure 4)
1120 IH-9013