support@nextlevelracing.com
)
A
10
A) Install 2 x T-Nuts into the top channel of both Base Members
B) Re-install End Caps previously uninstalled in Step 09.
MOTION BRACKET
INSTALLATION
RECOMMENDED
MOUNTING LOCATION
TALLER USER
MOUNTING LOCATION
(
)
OPTIONAL FOR USERS 170cm or TALLER
INVERTED
MOUNTING LOCATION
(
)
OPTIONAL FOR USERS 160cm or SHORTER
(
)
NOTE: ONLY TOP ROW CAN BE USED
PARTS:
)
B
• • 4 x FULL WIDTH T-NUTS
STEPS: 11a - 11b
STEPS: 12a - 12b
STEPS: 13a - 13b
10
RECOMMENDED V3 MOTION SETUP
11a
Align the countersunk holes on the Motion Brackets with the NLR Motion V3 mounting holes.
Repeat
on Other
Side
11b
Bolt through and secure with 3 x M8 Countersunk Bolts. Repeat on the other side. Skip to Step 14.
OPTIONAL V3 MOTION SETUP
(USERS 170cm or TALLER)
12a
Align the counter sunk holes on the Motion Brackets with the NLR Motion V3 mounting holes.
Video Instruction: bit.ly/nlrbuild
PARTS:
• • MOTION BRACKETS
PARTS:
• • 6 x M8 20mm COUNTERSUNK
BOLTS
MOUNTED VIEW
MOUNTED VIEW
PARTS:
• • MOTION BRACKETS
11