Kohler PRO 3.7 Manual Del Usuario página 16

Ocultar thumbs Ver también para PRO 3.7:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

9.4
Install Wheelbarrow Handle Kit
Wheelbarrow handle kit includes two wheelbarrow handles
and mounting hardware.
1.
Align handle with holes on frame.
2.
Place washers between handle and frame while
installing screw.
3.
Thread nut to screw. Torque to 4 in. lb. (0.5 Nm).
9.5
Install Cord Management Kit
Cord management kit includes 2 posts and mounting
hardware. Cord management kit can be installed anywhere
on unit on same side, not across unit.
1.
Place post sides together onto frame.
2.
Place 3 nuts into holes in 1 side.
3.
While holding together, insert screws into other side
and thread into nuts. Torque to 221 in. lb. (25 Nm).
9.6
Install Hand Truck Handle Kit
A clamping device or an assistant to hold assembly while installing
kit will make process easier.
Hand truck handle kit includes hand truck handle and
mounting hardware.
1.
Position hand truck handle on unit aligning frame
holes and handle holes.
2.
Place washer between handle and frame.
3.
While holding in this position, install screws.
4.
Thread nuts to screws. Torque to 4 in. lb. (0.5 Nm).
5.
Install release knob through frame. Place washer
and hitch pin on inside of assembly.
9.7
Install Isolator Kit
Isolator Kit includes 4 isolators and mounting hardware.
1.
Align isolator holes under holes of frame.
2.
While holding in this position, install screws.
3.
Thread nuts to screws. Torque to 221 in. lb. (25
Nm).
12
Figure 6
Wheelbarrow Handle Kit
Figure 7
Cord Management Kit
Figure 8
Hand Truck Handle Kit
Figure 9
Isolator Kit
TP-7213 7/21

Publicidad

Tabla de contenido
loading

Tabla de contenido