Installation Precautions; Dimensions; Installation Requirements - Sime SHP M PRO Manual De Instalación

Ocultar thumbs Ver también para SHP M PRO:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

7 INSTALLATION PRECAUTIONS

7.1 Dimensions

Model
A
B
5-16kW
1040
410

7.2 Installation requirements

Check the strength and level of the installation ground so that the unit may not cause any vibrations or noise during its
operation.
In accordance with the foundation drawing in the figure, fix the unit securely by means of foundation bolts. (Prepare four sets
each of Φ10 Expansion bolts, nuts and washers which are readily available in the market.)
Screw in the foundation bolts until their length is 20 mm from the foundation surface.
(unit: mm)
Φ10 Expansion
bolt
Rubber
shocking
proof mat
Solid
ground
≥80
Concrete
or roofing
basement
h≥100mm
I
J
K
E
D
C
B
C
D
E
F
458
523
191
656
≥100
10
H
F
G
M
A
L
G
H
I
J
64
865
165
279
(unit:mm)
K
L
M
89
1068
450

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido