Before Installation - Klarstein FULL HOUSE DOWN AIR Manual De Instrucciones

Ocultar thumbs Ver también para FULL HOUSE DOWN AIR:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

EN
50

BEFORE INSTALLATION

Preparation of the work surface
Cut out the work surface according to the dimensions in the drawing. For installation
purposes, keep at least 5 cm of worktop around the hole. Make sure that the thickness
of the worktop is at least 30 mm. Select a heat-resistant and insulating worktop material.
Wood and similar fibre-rich or moisture-binding material should only be chosen
as a work surface if it has been impregnated to avoid the risk of electric shock and
deformation due to heat.
Note: The safety distance between the sides of the hob and the inside of the worktop
should be at least 3 mm.
Note: The dimensions given in the table are in "mm".
L
W
H
880
520
62
In all circumstances, ensure that the unit is adequately ventilated and that the air inlet
and outlet openings are not blocked. Make sure the unit is in good condition before
installing it.
D
A
58
770
495
B
X
min. 50
min. 3
F

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

10039858

Tabla de contenido