MAINTENANCE
Periodically inspect the water level to ensure the system has enough water.
NOTE: The water level should remain at the top layer of rock in the pit.
Winterize the vault if exposed to a freezing environment:
1. Pump water out of reservoir.
2. Remove water in hose upstream of the ball valve.
3. Remove pump and store in a dry place.
Refer to manufacturer's manual for pump maintenance.
MAINTENANCE
Physical Installation
3