Acqua Brevetti BravaDOS PM010 Instrucciones De Instalacion Y Uso página 32

Ocultar thumbs Ver también para BravaDOS PM010:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

B1.5 Allowed installation schemes
PM010
B1.6 Electrical checks after installation
1) Do not refill the storage tank with AcquaSIL 20/40
2) Insert the electric plug in a socket.
3) If the red led remains permanently lighted on and an acoustic signal is emitted by the
electric control board it means that the minimum level alarm is running. The red led and the
acoustic signal will be present until AcquaSIL 20/40
you have not AcquaSIL 20/40
4) Refill the storage tank with AcquaSIL 20/40
5) Check for the green led which should remain permanently lighted on.
6) Open a sampling faucet placed downstream the filter and check for the flashing of the
green led. If the green led flashes, the pump is working properly.
MAN 116 – Rev.7
BravaDOS - ENGLISH
CORRECT ASSEMBLY
PM012
.
®
do not use any other chemical and buy it.
®
®.
PM014-16
is poured inside the storage tank. If
®
PAG.E-13

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Bravados pm012Bravados pm014Bravados pm016

Tabla de contenido