Mounting The Door Handle; Installing The Air Intake Pipes; Securing The Side Shelf Brackets - Pit Boss Champion PBV24CB Guía De Montaje

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 16

5. MOUNTING THE DOOR HANDLE

Parts Required:
1
x
Door Handle (#16)
Installation:
First, open the Charcoal Refill Door. Pull the end of the Door Buckles to
release the Door Buckles latch that seals the Charcoal Refill Door. Note
detail illustration 5A & 5B.
Remove the pre-installed screws, nylon gaskets, locking washers, and
washers. From the inside the Charcoal Refill Door, insert one screw,
locking washer, and washer to protrude to the outside, then add the
nylon gasket over the protruding screw. Secure the screw (from the
inside) into the Door Handle. Repeat same installation for other end of
the Door Handle. Note illustration 5B.

6. INSTALLING THE AIR INTAKE PIPES

Parts Required:
2
x
Air Intake Pipe (#9)
2
x
Air Intake Silicone Pad (#10)
10 x
Screw (#E)
Installation:
Starting on one side, place an Air Intake Silicon Pad between the Air
Intake Pipe and align the mounting holes with the Barrel Body, as
shown. Then tighten each of the four screws halfway first. Secure a fifth
screw, from the inside of the Barrel Body, into the upper part of the
Air Intake Pipe. Once all five screws are mounted and aligned properly,
tighten completely.
Repeat same installation for the other Air Intake Pipe on the opposing
side of the Barrel Body.
IMPORTANT: The bottom part of each Air Intake Pipe should be
completely sealed (once completely tightened) to avoid any chance
of embers escaping while the charcoal is lit. If there are gaps, unscrew
and attempt to reinstall again.

7. SECURING THE SIDE SHELF BRACKETS

Parts Required:
2
x
Side Shelf Bracket - Left (#7)
2
x
Side Shelf Bracket - Right (#8)
8
x
Screw (#H)
Installation:
Note illustration for proper arrangement. Mount one Side Shelf Bracket
to the Barrel Body using two screws. Install each screw halfway first,
then tighten completely when both screws are mounted and aligned
properly. Repeat installation for the other three Side Shelf Brackets to
the Barrel Body.
6
5A
5B
6
E
9
E
10
E
7
7
8
H
H
16
NYLON
GASKET
9
E
10
8
H
H
7

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

10806

Tabla de contenido