Hitachi PSC-A16RS Manual De Instalación Y Funcionamiento página 11

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 21
¡ SW18 (Address Setting)
Address 0
Address 1
Address 4
Address 5
Divide the power line for the centralized ON/OFF controller from the
main power line by a pull box as shown in the next figure.
AC 220V or 240V
To Outdoor unit or breaker
Pull box
Centralized
ON/OFF
Controller
¡ Judgment of H-LINKII Adaptive
H-LINKII Adaptive
SW19-4 Pin: OFF
NOTE:
*1: The "other centralized controllers" described in this flowchart do not include PSC-5HR.
*2: Refer to the "Installation & Maintenance Manual" of other centralized controllers for the each setting
INSTALLATION AND OPERATION MANUAL
Address 2
Address 3
Address 6
Address 7
Indoor unit
START
Other central controller is
NO
connected in the same
H-LINK (control line) system
(1*)
All models of other connected
NO
central controllers are
PSC-A*** or HC-A*** (*1)
Non H-LINKII Adaptive
SW19-4 Pin: ON
CAUTION:
- Check to ensure that the wiring is correct. Incorrect wiring may
cause malfunction of the centralized ON/OFF controller.
- Turn OFF the power supply of the air conditioner and the
centralized ON/OFF controller when performing the wiring work.
If the wiring work is performed while the power supply of the
centralized ON/OFF controller is being supplied, it may cause
malfunction of the centralized ON/OFF controller.
- DO NOT run all the transmission cable for the centralized
ON/OFF controller along the power line and other transmission
cables, or malfunction may occur due to the noise, etc. If the
transmission cable for the centralized ON/OFF controller is
required to be run along the power line and other transmission
cables, separate the cable more than 30 cm away from other
cables, or run the cable through a metal tube and earth the tube.
- In case of applying high voltage to the TB2, the fuse on the PCB
is blown out.
In such a case, firstly correct the wiring to TB1, and then set No.2
pin ON.
SW1
Fuse Recover)
- Connect the shield tube of cable to earth.
YES
YES
The setting of other connected
NO
centralized controllers are all
H-LINKII adaptive (*2)
11
YES
H-LINKII Adaptive
SW19-4 Pin: OFF

Publicidad

Tabla de contenido
loading

Tabla de contenido