TOPDON BT50 Manual Del Usuario página 14

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 53
3. CHARGING TEST
3.1 BEFORE TEST
The engine must be ON during test.
3.2 STEPS
1) Press the "OK" button to display the main menu. Then
select "3. Charging Test" and press the "OK" button to
confirm.
2) Start your engine, then press the "OK" button to conduct
a "Ripple Test". The interface will stay for 5 seconds and then
automatically jump to next page.
Please start engine,
Press OK to
continue.
3) Follow the on-screen instructions to increase your engine
speed to 2500 r/min and hold for 5 seconds. Then press the
"OK" button and wait a few seconds for the test result.
6. About

Publicidad

Tabla de contenido
loading

Tabla de contenido