INSTALLATION NOTES
This unit is best installed by two people.
Cover drain with tape prior to installation to prevent the loss of small parts.
Unpack your unit carefully and inspect for freight damage. Lay out and identify all parts using instruction sheet as a reference. Before
discarding the carton check to see that no small hardware parts have fallen to the bottom of the box. If any parts are damaged or
missing refer to the description noted in the instructions when inquiring about replacements.
Shower door assembly may have the "Fixed Door Post" Factory Installed onto "Fixed Glass Door"
Handle the glass panels carefully and protect the edges. Although tempered glass is very resistant to breakage the glass can still break
if unequal pressure is applied during installation and the sharp corners of the panel can damage tile and ooring surface.
Be sure to wear safety glasses whenever drilling or cutting. When drilling holes in ceramic tile or marble use a center punch and
hammer to carefully break the glazed surface. This will prevent skidding when drilling.
NOTE: TEMPERED GLASS CANNOT BE DRILLED, CUT OR MODIFIED.
1
ASSEMBLE FRAME - REFER TO ASSEMBLY DRAWING
NOTE: Determine if Fixed Door Panel will be mounted on the left or right side
of frame prior to mounting posts and rails together.
Procedure is shown with Fixed Door on the Right side.
– Refer to page 8 if mounting fixed door on Left side.
– For partially assembled Fixed Door, if Frame/Glass requires assembly,
refer to STEP 3.
NOTE: If Fixed Door Post is already factory installed on "Fixed Glass
Panel" (14), "Fixed Door Water Deflectors" (21) need to be installed
first before installing Top & Bottom Horizontal Rails. Place Retaining
Blocks (12) on Fixed Door Panel (14) at top and bottom (see fig A
in STEP 3) and use them as guides to install the top and bottom Fixed
Door Water Deflectors (21). Once the Water Deflectors are in place,
remove the Retaining Blocks for later installation and continue with
remaining installation of Horizontal Rails.
1A - 1B
Slide Horizontal Rails (9 & 17) onto Door Posts (7 & 14)
and screw together using matching square bit.
NOTE: Top & Bottom Horizontal rails are identical. Door Roller Stops
are installed inside the tracks on one end of each Horizontal Rail
and should be installed towards the Fixed Door Post side.
Insure flange side of both Wall Posts (side with pre-drilled holes)
are facing inside shower area.
VIEW FROM INSIDE
1B-Sliding Door Post
Screw M4x35
Screw M4x35
VIEW FROM LEFT SIDE - INSIDE
2A
(7 & 14) Door Post
(6) Wall Post
2A-2B Slide Wall Posts (6) on each end. The Wall Posts t inside Posts of the frame.
Insure ange side of both Wall Posts (side with pre-drilled holes) are facing inside shower area.
710286-100 Rev. 2 03/2020
1A-Fixed Door Post
Flat Head
Screw
M4x35
*if included otherwise use M4x35
as supplied
VIEW FROM RIGHT SIDE - INSIDE
2B
1B
7
4
17
1A
14