Descargar Imprimir esta página

Roger Technology BIONIK Serie Instrucciones Y Advertencias Para El Instalador página 26

Ocultar thumbs Ver también para BIONIK Serie:

Publicidad

11.4
Selecting direction of aperture
side (seen from the inspection hatch side).
Whenever corrective actions are carried out, pay the utmost attention when
releasing, locking or moving the internal mechanical parts. These
operations could be hazardous for the installer.
8
BARRIER INSTALLED ON THE RIGHT (SEEN FROM THE INSPECTION HATCH SIDE)
AND THE BOOM OPENING/CLOSURE GATE ON THE LEFT
BARRIER INSTALLED ON THE LEFT (SEEN FROM THE INSPECTION HATCH SIDE)
AND THE BOOM OPENING/CLOSURE GATE ON THE RIGHT
26
7
INSTALLATION
ON THE LEFT
INSTALLATION
ON THE RIGHT

Publicidad

loading