Do A Leak Inspection; Clean The Instrument; Replace The Sample Probe - Hach QbD1200 AutoSampler Manual Del Usuario

Ocultar thumbs Ver también para QbD1200 AutoSampler:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 63
1. Set the instrument power to off.
2. Remove the power cord from the power supply.

Do a leak inspection

Inspect for leaks from the sample probe, the sample tube or the rinse station and the rinse station
tubing.
1. Shut down the auto sampler. Refer to the
2. Examine the sample probe, the sample tube or the rinse station and the rinse station tubing for
damage and evidence of leaks.
3. Replace all of the components that show evidence of leaks or damage.

Clean the instrument

Chemical exposure hazard. Obey laboratory safety procedures and wear all of the personal protective
equipment appropriate to the chemicals that are handled. Refer to the current safety data sheets
(MSDS/SDS) for safety protocols.
Clean the instrument with water. Fumes from cleaning agents can have an effect on the results. Do not let
cleaning agents come into contact with the lead screws. Do not put lubricant on the lead screws.
Spills can occur during use of the instrument. For the best operation, remove spills daily. Clean the
instrument as necessary to prevent instrument damage. Remove contaminants and abrasive material
from moving parts. Remove chemical spills according to MSDS/SDS instructions.
Items to collect:
• Dry, lint-free cloth
• Soft cloth towel
• Clean water
1. Remove the instrument from service. Refer to the
2. Remove the sample tray.
3. Use the dry, lint-free cloth to remove loose particles from the lead screws.
4. Use the cloth towel to clean the outer surface and base of the instrument.
5. Use clean water to clean the sample tray. Remove all stains and spills.
Note: Make sure to clean the slider block and guide rails along the tube of the arm.
6. Use a dry towel to remove all moisture from the instrument.
Before the power is set to on, let the instrument fully dry.
7. Put the dry sampler tray on the base.

Replace the sample probe

If the probe has leaks or shows signs of damage, replace the probe.
1. Remove the instrument from service. Refer to the
2. Remove the worn sample probe.
Note: Too much force can damage the mechanical Z-drive.
3. Install the new probe. Refer to
Shut-down procedure
C A U T I O N
N O T I C E
Shut-down procedure
Shut-down procedure
Install the mechanical Z-drive
on page 14.
on page 14.
on page 14.
on page 9.
English 15

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Tabla de contenido