Descargar Imprimir esta página

Tuthill FILL-RITE 900CDP Serie Manual De Instalación, Operación Y Seguridad Del Propietario página 3

Medidor digital de líquido

Publicidad

Idiomas disponibles

Idiomas disponibles

Safety Information
WARNING! To insure safe and proper operation of your equipment, it is critical
to read and adhere to all of the following safety warnings and precautions.
Improper installation or use of this product can cause serious bodily injury or
death!
NEVER smoke near the meter, or use the meter near open flames when
metering a flammable liquid! Fire can result!
A Fill-Rite Filter should be used on the meter outlet to insure no foreign
material is transferred to the fuel tank.
Threaded pipe joints and connections should be sealed with the appropriate
sealant or sealant tape to minimize the possibility of leaks.
Storage tanks should be securely anchored to prevent shifting or tipping
when full or empty.
To minimize static electricity build up, use only static wire conductive hose
when metering flammable fluids, and keep the fill nozzle in contact with the
container being filled during the filling process.
DO NOT exceed 50 psi/ 3.5 BARS line pressure.
DO NOT install additional foot valve or check valve without a pressure relief
valve; otherwise the meter may rupture.
WARNING! This product should not be used to transfer any type of aviation fuel.
WARNING! This product is not suited for use with fluids intended for human
or animal consumption or fluids containing water. Nickel plated meters are
approved for use with non-potable water, antifreeze, certain agricultural
chemicals, and other specialized water applications.
Installation
Meters are furnished for horizontal piping; left to
right flow. The display can be rotated to any of four
positions for horizontal or vertical piping and for
either direction of flow.
1.
Determine direction for fluid to flow.
2.
Install meter observing directional arrow on
casting on back of meter (circled). Liquid
MUST flow in the direction of the arrow for
proper operation.
3.
Once the meter is plumbed into place,
remove four screws on corners of meter face
(Torx T25 bit required).
4.
Rotate meter face assembly to desired
orientation.
5.
Replace four screws.
6.
Complete installation by making sure the
joints are properly sealed and meter is
positioned for easy viewing and use.
CAUTION! Threaded pipe joints and connections should be sealed with the
appropriate sealant or sealant tape to minimize the possibility of leaks.
3
Flow
Direction

Publicidad

loading