Tank Installation - Hog Slat Grower Select HSES-RA Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Evaporative Cooling System
Tank Installation Instructions
13. Begin by gluing (1) of the 10" PVC endcaps onto the bottom of Sump Tee.
Allow glue to cure completely before in ground installation.
14. Dig roughly a 15" diameter hole 12" from the end of the trough. See Image below. Dig to a depth of
roughly 38" below the top of the trough support brackets. Add/remove material until bottom of tank is
supported where the 8" connection is in line with the trough.
15. Clean, prepare, and glue the tank onto the assembled PVC trough.
16. Back fill around the tank to secure.
Hog Slat Inc. Newton Grove, NC USA February 2019
Ensure tank remains free of debris during this step.
12

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Hses-ra

Tabla de contenido