Descargar Imprimir esta página

Hog Slat Grower Select HSES-RA Manual Del Usuario página 7

Publicidad

Idiomas disponibles

Idiomas disponibles

Evaporative Cooling System
Top Assembly Instructions
START FROM THE TANK END OF THE SYSTEM FOR THE FOLLOWING STEPS
1. Referencing Figure 2, mark location of top of pad support and bottom brackets with chalk lines. Verify
with level.
2. Using supplied #10 X 1.5" Hex head mounting screws, secure top pad support along chalk line. Repeat
for the length of the rough opening. It may be necessary to cut the final top pad support to fit
nonstandard rough opening lengths. If necessary, drill a second mounting hole to ensure a minimum of 2
fasteners on a modified part.
3. Using supplied #10 X 1.5" Hex head mounting screws secure spray bar supports on 60" centers.
Place the first spray bar support at flush with the top pad support at the tank end of the system. The
bottom of the spray bar support brackets should sit directly on the top of the top pad retainer. Repeat for
the length of the system. A Final bracket should be installed flush with the top pad support at the capped
end of the system.
Hog Slat Inc. Newton Grove, NC USA February 2019
7

Publicidad

loading

Este manual también es adecuado para:

Hses-ra