Descargar Imprimir esta página

ABB ODINsingle Manual De Instrucciones página 15

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 19
Installation
Installation and commissioning may only
be carried out by authorised electrical
specialist. The installer is responsible that
the electricity meter is correctly and safely
installed. Circuit protection for the electricity
meter must be installed: max. 63A (MCB C
characteristic or fuse gLgG).
1
2
3
4
5
6
L1
1
N
11
GB
12 mm
3
13
2CMC482010M0002

Publicidad

loading