English
3. Move the magnet half in the direction of the pump on
the glass until both magnet halves ①/② lie one above
the other.
Laying the mains cable (⌦B)
1. Guide the mains cable ④, as required, left or right
along the pump body.
2. Fasten the cable to the corresponding bracket ③.
Operation
CAUTION! Material damage.
The pump must not run dry.
Switching the pump on/off
1. Insert the mains plug in the mains socket. Attention:
The pump starts immediately!
2. To turn it off, remove the mains plug from the mains
socket.
Setting the flow direction (⌦C)
1. Turn the flow pump to the desired flow direction via the
ball joint.
2. Fix into position by tightening the retaining ring ⑤.
Controlling the flow rate
streamON+ 3500 (⌦D)
1. Move the power controller ⑥ forwards or backwards in
order to adjust the water flow rate.
streamON+ 6500 / 9500 (⌦E)
1. Turn the power controller ⑦ left or right in order to
adjust the water flow rate.
26