OPERATING THE PUMP
Speed Priorities
For schedule duration settings, SPEEDS are
prioritized as follows: SPEED 1 -> SPEED 2 ->
SPEED 3 -> SPEED 4. SPEED 1 is the highest
priority, while SPEED 4 is the lowest.
The drive will not allow a user to program a schedule
of more than 24 hours. When the 24th hour of
duration is programmed, it will take time from the
lower priority speeds in order to add them to the
SPEED currently being adjusted.
EXAMPLE:
Starting Schedule (Before Adjustment)
SPEED 1 duration = 18 hours
SPEED 2 duration = 2 hours
SPEED 3 duration = 2 hours
SPEED 4 duration = 2 hours
If the user reprograms SPEED 1 to run for
22 hours, SPEED 2 (lower priority speed) will
automatically adjust to a 1 hour duration and
SPEED 4 (lowest priority speed) will adjust to a 0
hour duration.
End Schedule (After Adjustment)
SPEED 1 duration = 22 hours
SPEED 2 duration = 1 hour
SPEED 3 duration = 1 hour
SPEED 4 duration = 0 hours
11
Copyright © 2022. All rights reserved • 95 North Oak Street • Kendallville, IN 46755
Operating The Pump While Running
If power is connected to the pump motor, pressing any
of the following buttons referred to in this section could
result in the motor starting. Failure to recognize this
could result in personal injury or damage to equipment.
Pressing the Display button will cycle through the
current parameters.
•
Speed - current run speed
•
Time - current time of day
•
Duration - amount of time remaining at the current
run speed
•
Watts - amount of watts currently being consumed
Pressing any of the Speed Buttons ('1', '2', '3', '4',
'Quick Clean') while the pump is running will act as
temporary override. It will run the speed and duration
that is programmed for that button. Once completed
it will default back to the appropriate point in the
programmed schedule.
Note: If you adjust the speeds of the schedule while
the pump is running, it will run the adjusted speed for
the rest of the current duration, but will not save the
adjustments.