Descargar Imprimir esta página

Solar BA44 Manual De Instrucciones página 5

Publicidad

Idiomas disponibles

Idiomas disponibles

Tester Preparation and Set-up
Installing Batteries
Open battery chambers (2) on the back of each handle and install (2)1.5V batteries
into each battery chamber.
Once the battery installation process is complete, please note that nothing will
appear on the tester display until it is connected to a 6 or 12 Volt battery.
Note: When the internal batteries run out of power, the tester display will read
"INTERNAL BATTERY LOW". When this happens, replace internal batteries
before performing any additional tests.
Battery Tester Controls
Enter/Select
Tester Configuration
Note: The tester does not have a back button or any means by which to backtrack
through the various functional steps. At any point in a particular process, there
are only two ways to get back to either the Home Screen or the Function Screen:
complete the current process or disconnect and reconnect the tester.
You must be properly connected to a battery (See Battery Tester Operation: Battery
Testing, steps 1-3 ) with internal batteries installed to configure the tester.
Upon proper battery connection (with internal batteries installed), the tester display will
splash the SOLAR logo for two seconds and then proceed to the Home Screen. The
Home Screen shows the battery status by providing the Open Circuit Voltage of the
connected battery.
Scroll
Forward/Increase
Scroll
Backward/Decrease

Publicidad

loading