WIKA LF-1 Manual De Instrucciones página 11

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

5. Commissioning, operation
5.4.2 Requirements for electrical connection
Cable diameter matches the cable bushing of the terminal enclosure.
Cable gland and seals are correctly seated.
No humidity can ingress at the cable end.
5.4.3 Requirement for shielding and grounding
The submersible pressure sensor must be shielded and grounded in accordance with the grounding concept of the
plant.
5.4.4 Fitting the measuring point tag
Before the submersible pressure sensor is wired, the measuring point tag must be attached to the cable. The measur-
ing point tag acts to identify the submersed instrument and contains a copy of the product label.
1. Remove the packaging at the cable end
2. Thread the measuring point tag onto the cable.
The rubber stops at the measuring point tag protect the cable and must be undamaged and correct mounted.
Position the measuring point tag so that, in the mounted state, it is easily reachable and protected against harsh
environmental conditions.
WIKA operating instructions submersible pressure sensor, model LF-1
EN
11

Publicidad

Tabla de contenido
loading

Tabla de contenido