Descargar Imprimir esta página

Waeco ASC 5500G RPA Instrucciones De Uso página 129

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

ASC5500G RPA
"Service completed" displays the amount of service work performed
using the air conditioning service unit since the last reset (see date).
9.8
Correcting the filling quantity for long service
hoses
I
NOTE
 If longer or shorter service hoses are required for the unit, you need
to adjust the filling quantities to the new hose lengths.
 The service hoses for the high and low pressure sides must always
be of the same length, as otherwise the filling quantities will not be
correctly measured.
1. In the basic menu, use the cursor keys  or  to select
"Other selections":
2. Press ENTER to confirm.
3. Use the cursor keys  or  to select "Service":
4. Press ENTER to confirm.
5. Enter the password "7732".
6. Enter the hose length in centimetres.
7. Press ENTER to confirm.
EN
Service completed:
Number
STOP-EXIT
Short selection
Free selection
Other selections
ENTER-OK
Int. vessel filling
Flushing
Reset scales.
Service.
Service tasks
07/03/17
4
129

Publicidad

loading