Descargar Imprimir esta página

Cole-Parmer WS-100 Serie Manual De Instrucciones página 3

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Location
The Cole-Parmer Water Still can be wall or bench mounted. Select a
convenient location which has access to the following services:–
Electricity Supply
Before connection please ensure that the line supply is suitable.
The Cole-Parmer Water Still WS-100-4 is suitable for supplies rated
at
3kW, 220-240V, 50/60Hz~ single phase.
WS-100-4-220 is suitable for supplies rated at 3kW, 200-240V,
50/60Hz~ single phase. Supplies should be fitted with a 30mA RCD
circuit breaker.
Water Supply
A cold water supply capable of providing a minimum flow rate of
60 l/hr. Ensure all water supplies are earth bonded.
Drain
A waste water drain located below the level of the still so that the
drain pipe can fall away straight without kinks or bends, to allow an
unimpeded flow. Ensure all drainage systems are earth bonded.
Reservoir
A distillate collection reservoir should be located beneath the still.
Assembly
Your Cole-Parmer WS-100-4 has been designed with ease of
assembly specifically in mind, but before commencing assembly
please study the illustrations and text to familiarise yourself with the
general lay¬out. During assembly, follow the sequence of
instructions and do not connect the mains electricity supply until
directed.
1.
Unpack the water still and identify the following components:–
Qty.
Component
1
Support stand with 2 boiler straps
1
Boiler
1
Condenser
1
Heater
or
1
Gasket Kit
1
Hose Kit
2.
Take the metal stand and place in the desired location.
Note that 2 screw holes are provided for wall fitting.
If wall mounting you must ensure you use appropriate
wall fixings that can hold a minimum weight of 28KG. If
you are in any doubt seek professional advice.
3.
Take the boiler W4000/B, the heater and gasket kit W4000/GK.
Figure 2 Flange assembly
Catalogue No.
W4000/S
W4000/B
WC48/M2
A6/6 (240V)
A6/6/EURO (220V)
W4000/GK
W4000/HK
Bolts
Tapered
Metal
glass
flange
tube
Assemble the heater into the boiler as shown in Figure 2.
i)
Insert the 3 bolts provided into the holes in the metal
flange and place the metal flange over the tapered glass
tube of the boiler – ensuring that the flat side of the flange
faces the boiler.
ii) Take the plastic insert and place this round the glass tube
and into the metal flange. Pull the flange and insert
towards the end of the glass tube so that they press onto
the glass.
iii) Place the rubber gasket over the heater coils and then
insert the heating element through the tapered glass tube
and into the boiler.
iv) Now secure the heater using the 3 bolts. Do not over
tighten.
4.
Feed the electric cable of the heater through the hole in the
base of the support stand. Place the boiler and heater assembly
in the 'cradle' of the stand. Ensure the stopcock on the boiler is
facing to the front. Secure with the 2 straps provided.
5.
Ensure that the sealing o-ring and stabilising o-ring are correctly
positioned, as shown in Figure 3. Fit the condenser WC48/M2
by mounting it onto the vapour tube of the boiler. Ensure the
Figure 3
Condenser
Sealing o-ring
Vapour tube
Stabilising o-ring
Plastic
Rubber
insert
gasket
Cooling
water
outlet
Outlet
tube
Heater
3

Publicidad

loading

Este manual también es adecuado para:

Ws-100-4Ws-100-4-220